FAT, SAT and commissioning for MedTech production equipment

Acceptance criteria from your URS and risk controls, FAT run or witnessed at the vendor, SAT and commissioning on site, deviations and punch list under control.

  • FAT
  • SAT
  • Commissioning
  • ISO 13485
  • ISO 14971
  • ISO 14644
Machine and its acceptance checklistFAT-0042
Typical tasks

From acceptance criteria to equipment ready for IQ.

FAT/SAT Acceptance Pack

Acceptance criteria split into FAT and SAT, a checklist and punch-list rules. One week, from CHF 1 500.

Criteria tableChecklistPunch list

FAT at the vendor, run or witnessed

Protocols and test scripts, so the evidence carries over to SAT.

FAT protocolEvidence

SAT and commissioning on site

Utilities, configuration baseline and SAT, without re-testing what FAT proved.

SAT reportBaseline

Deviations and punch-list close-out

Each item with impact, owner and closure evidence, ready for IQ and OQ.

Deviation logClosure evidence
How we start

From the first call to the documents, in four steps.

Work starts within a week of the offer.

  1. 30 minutes

    Scope call

    The device, the task, the deadline and your quality system.

    Call notes
  2. Within 2 days

    Fixed offer

    Deliverables, price and dates on one page.

    Offer · plan
  3. Start within a week

    Work

    Design, build and test, with a short status every week.

    Weekly status · reviews
  4. At the end

    Handover

    Everything in your templates, ready for your DHF and your production.

    Drawings · reports · files
Proof

FAT and SAT written and run for two cleanroom production machines, qualified from DQ to PQ within two months.

From our founder's track record, for a Swiss medical device manufacturer.

Standards we work with
ISO 13485
Acceptance evidence under the QMS
ISO 14971
Acceptance criteria from risk controls
GAMP 5
Where the equipment carries software
ISO 14644
Cleanroom installations

FAT proves the vendor build against the URS before shipment. SAT confirms the same criteria after installation; IQ and OQ build on that evidence.

FAQ

Questions we hear first.

How long do FAT, SAT and commissioning take?

It depends on vendor readiness and equipment complexity. A clear acceptance pack shortens both and avoids re-testing.

On site or remote?

Criteria and protocols are written remotely. FAT witnessing, SAT and commissioning are on site in Switzerland and Germany.

What do you need from us?

URS, risk assessment, the vendor's FAT plan, equipment specifications and your target acceptance criteria.

Do you sign an NDA, and who owns the results?

Yes. Techkrates signs your NDA before the first technical details, and the designs, documents and data made for your project belong to you.

In which language are the documents?

German or English, in your templates and your document numbering.

Send two or three lines about the device and what you need.

An engineer answers within 24 hours. At a fixed price per task or from CHF 950 per day.