FAT/SAT Acceptance Pack
Acceptance criteria split into FAT and SAT, a checklist and punch-list rules. One week, from CHF 1 500.
Acceptance criteria from your URS and risk controls, FAT run or witnessed at the vendor, SAT and commissioning on site, deviations and punch list under control.
Acceptance criteria split into FAT and SAT, a checklist and punch-list rules. One week, from CHF 1 500.
Protocols and test scripts, so the evidence carries over to SAT.
Utilities, configuration baseline and SAT, without re-testing what FAT proved.
Each item with impact, owner and closure evidence, ready for IQ and OQ.
Work starts within a week of the offer.
The device, the task, the deadline and your quality system.
Call notesDeliverables, price and dates on one page.
Offer · planDesign, build and test, with a short status every week.
Weekly status · reviewsEverything in your templates, ready for your DHF and your production.
Drawings · reports · filesFAT and SAT written and run for two cleanroom production machines, qualified from DQ to PQ within two months.
From our founder's track record, for a Swiss medical device manufacturer.
FAT proves the vendor build against the URS before shipment. SAT confirms the same criteria after installation; IQ and OQ build on that evidence.
It depends on vendor readiness and equipment complexity. A clear acceptance pack shortens both and avoids re-testing.
Criteria and protocols are written remotely. FAT witnessing, SAT and commissioning are on site in Switzerland and Germany.
URS, risk assessment, the vendor's FAT plan, equipment specifications and your target acceptance criteria.
Yes. Techkrates signs your NDA before the first technical details, and the designs, documents and data made for your project belong to you.
German or English, in your templates and your document numbering.
An engineer answers within 24 hours. At a fixed price per task or from CHF 950 per day.