Techkrates
Home / Services / Industrialization

Industrialization and production equipment for MedTech manufacturing

From a working prototype to a product production can build and test: transfer documents, assembly fixtures, semi-automatic stations and special machines, made safe and ready for CE.

  • ISO 12100
  • ISO 13849-1
  • IEC 60204-1
  • Machinery Regulation
  • ISO 13485
Line with three stations and parts in flowLayout L-03
Typical tasks

From the prototype to the station on the line.

Transfer of a design to production

Production documents, assembly and test instructions, pilot series.

Production fileWork instructionsPilot run

An assembly fixture or semi-automatic station

Specified, designed and built with partner workshops, then brought up on site.

ConceptBuildCE file

Equipment concept for capex approval

A short paid study for a new station or machine that ends in the document for your budget decision.

URSConceptRisk analysisBudget

Machinery safety and CE for in-house equipment

Risk assessment, safety functions and the technical file for equipment you build yourself.

Risk assessmentSafety functionsTechnical file
How we start

From the first call to the documents, in four steps.

Work starts within a week of the offer.

  1. 30 minutes

    Scope call

    The device, the task, the deadline and your quality system.

    Call notes
  2. Within 2 days

    Fixed offer

    Deliverables, price and dates on one page.

    Offer · plan
  3. Start within a week

    Work

    Design, build and test, with a short status every week.

    Weekly status · reviews
  4. At the end

    Handover

    Everything in your templates, ready for your DHF and your production.

    Drawings · reports · files
Proof

Two cleanroom production machines qualified from DQ to PQ in two months, FAT and SAT included.

From our founder's track record. Larger machines are built by machine builders; we write the URS and the acceptance criteria and accompany the supplier.

Standards we work with
ISO 12100
Risk assessment of machinery
ISO 13849-1
Safety-related parts of the control
IEC 60204-1
Electrical equipment of machines
2006/42/EC, (EU) 2023/1230
Machinery Directive and Regulation
ISO 13485
Process validation for production

The new EU Machinery Regulation applies from 20 January 2027. Equipment designed now should already follow it.

FAQ

Questions we hear first.

Do you build machines?

We specify, design and supervise the build with partner workshops and machine builders. For larger machines we write the URS and the acceptance criteria and accompany the supplier through FAT and SAT.

Do you work outside MedTech?

Yes. Machine builders, precision and contract manufacturers, lab and analytical instruments, optics and sensors, with the same engineering and documentation. See engineering for other industries.

What does the capex study cost?

From CHF 3 900, one to two weeks. The documents carry over into the DQ when the equipment is built.

Do you sign an NDA, and who owns the results?

Yes. Techkrates signs your NDA before the first technical details, and the designs, documents and data made for your project belong to you.

In which language are the documents?

German or English, in your templates and your document numbering.

Send two or three lines about the device and what you need.

An engineer answers within 24 hours. At a fixed price per task or from CHF 950 per day.

Company
Techkrates, Zurich
On site
Switzerland and Germany
Languages
English, German
Contact
filip [at] techkrates.com · +41 78 320 66 33 · WhatsApp · answer within 24 hours